Skip to content
WORK 03Supply chain · 2025
Aerial view of a container yard — the network SKYLARK replans every 90 seconds
SKYLARK

move the pointer — daylight follows it

Photo: CHUTTERSNAP / Unsplash

Twelve thousand trucks stop driving yesterday's plan.

A live routing engine that replans the whole fleet every 90 seconds — $8.2M in fuel back in the first year.

Client

Northtrail Logistics

Timeline

11 months

Craft

Platform & Cloud

Product Engineering

06:40THE PROBLEM

What needed to change

Northtrail moves freight with 12,400 vehicles across three countries. Routes were computed overnight and printed at 05:00 — by 09:00 they were fiction. Traffic, dock queues and same-day pickups meant drivers improvised, dispatchers firefought by phone, and 13% of deliveries missed their window.

Their ops director put it best in our first meeting: 'We plan like it's 1998 and drive like it's 2025, and we pay the difference in diesel.'

06:55THE BUILD

What we made together

MOVE 01

A solver that never sleeps

A constraint solver replans the entire network every 90 seconds — live traffic, dock capacity, driver hours and cold-chain limits in one optimization pass that lands in under 40 seconds.

MOVE 02

The driver app that earns its place

Drivers keep a plan that quietly updates, with reroutes explained in one line. Adoption hit 97% in six weeks because it never asks for anything it can infer.

MOVE 03

A control tower, not a dashboard

Dispatch sees the fleet as a living map — exceptions surface themselves, ranked by cost, each with a one-click resolution the solver has already checked.

MOVE 04

Telemetry at freight scale

Positions, temperatures and door events stream through Kafka into ClickHouse — 1.4 billion events a month, queryable in under a second, kept for the lawyers and the data scientists alike.

07:20THE OUTCOME

What moved in daylight

SKYLARK cut fuel burn 17.3% and lifted on-time delivery from 87.1% to 96.4% — worth $8.2M in year one, before counting the contracts won on the new SLA. The overnight planning batch was decommissioned in March; nobody held a funeral.

90 s

full-fleet replan

from overnight batch

−17.3%

fuel consumption

$8.2M saved in year one

96.4%

on-time delivery

from 87.1%

12,400

vehicles live

1.4B events/month

The first partner that treated a deadline like physics, not weather. They named a date in January and hit it in October.

M. LindgrenOps Director, Northtrail Logistics

NEXT WORK

Lumen & Oak · golden hour

Lumen & Oak's considered shelves — a storefront finally as fast as its taste